Internet availability via the fixed network - Upload ≥ 10 Mbit/s
The broadband map gives an overview of the coverage of modern telecommunications networks in Switzerland. The coverage situation is shown in the form of statistical data per grid square (...
Internet availability via the fixed network - Upload ≥ 100 Mbit/s
The broadband map gives an overview of the coverage of modern telecommunications networks in Switzerland. The coverage situation is shown in the form of statistical data per grid square (...
Internet availability via the fixed network - Upload ≥ 1000 Mbit/s
The broadband map gives an overview of the coverage of modern telecommunications networks in Switzerland. The coverage situation is shown in the form of statistical data per grid square (...
Waste incineration plants (MWI)
Waste incineration is the burning of combustible waste components to reduce the volume of the waste while using the energy it contains.In 2017, Switzerland had 30 municipal waste incinera...
Nuclear Power Plants
Nuclear power plants are facilities for the commercial generation of electrical power from controlled nuclear fission. The four Swiss nuclear power plants have a total output of 3.2 GW. T...
Database of wasterwater treatment plants (ARA-DB) - capacity (PE)
Since the 1980s, the FOEN (formerly the Swiss Agency for the Environment, Forests and Landscape) has kept a database with information about the central ARA. The underlying original maps w...
Database of wastewater treatment plants (ARA-DB) - percentage waste water in the receiving watercourses at low water
Since the 1980s, the FOEN (formerly the Swiss Agency for the Environment, Forests and Landscape) has kept a database with information about the central ARA. The underlying original maps w...
Database of wastewater treatment plants (ARA-DB) - cleaning type
Since the 1980s, the FOEN (formerly the Swiss Agency for the Environment, Forests and Landscape) has kept a database with information about the central ARA. The underlying original maps w...
Potential of small hydropower plants in Switzerland
The geodata product ‘Potential of small hydropower plants in Switzerland’ is the result of a GIS-based analysis carried out in 2012 as part of the research project 102835 ‘Survey of Switz...
Wind energy concept – Swiss federal government basic map of main areas with wind-power potential
The wind energy concept is a concept in accordance with Art. 13 of the Swiss Spatial Planning Act (SPA, SR 700). The concept defines both the principal federal government interests which ...
Number of generally accessible charging points in the ‘Convenient’ charging world for the year 2035
The map shows how many generally accessible charging points should be available in the selected municipality in 2035 in order to meet the charging demand. A charging point is a facility f...
Number of generally accessible charging points in the ‘Flexible’ charging world for the year 2035
The map shows how many generally accessible charging points should be available in the selected municipality in 2035 in order to meet the charging demand. A charging point is a facility f...
Number of generally accessible charging points in the ‘Planned’ charging world for 2035
The map shows how many generally accessible charging points should be available in the selected municipality in 2035 in order to meet the charging demand. A charging point is a facility f...
Charging requirements: stock of plug-in vehicles for the year 2035
The map shows the proportion of plug-in vehicles in relation to all registered passenger cars (in per cent) for each selected municipality. The number of existing vehicles (passenger cars...
Charging requirements: Home charging availability in the ‘Convenient’ charging world for the year 2035
The map shows the percentage of plug-in vehicles (battery electric vehicles and plug-in hybrids) per selected municipality that will have no charging facilities at home or at work in 2035...
Charging requirements: Home charging availability in the ‘Flexible’ charging world for the year 2035
The map shows the percentage of plug-in vehicles (battery electric vehicles and plug-in hybrids) per selected municipality that will have no charging facilities at home or at work in 2035...
Charging requirements: Home charging availability in the charging world ‘Planned’ for the year 2035
The map shows the percentage of plug-in vehicles (battery electric vehicles and plug-in hybrids) per selected municipality that will have no charging facilities at home or at work in 2035...
Electricity requirements for plug-in vehicles for the year 2035
The map shows for each selected municipality what percentage of electrical energy will be charged at home in 2035 according to the "Bequem" charging world. In addition, the total electric...
Charging requirement scenarios
What charging infrastructure for plug-in electric vehicles will we need tomorrow? And where exactly? This can only be answered by knowing the future charging requirements. The “charging d...
Location and adjoining areas of pipeline systems according to the Ordnance on Protection against Major Accidents
The Ordinance on Protection against Major Accidents (MAO, SR 814.012) is designed to protect the public and the environment from serious damage resulting from major accidents. It regulate...
Local/regional radio coverage areas
Coverage areas of all private local/regional radio broadcasters with a performance mandate and fee-splitting in accordance with Article 38 and a performance mandate in accordance with Art...
Local/regional TV coverage areas
Coverage areas of all private local/regional television broadcasters with a performance mandate and fee-splitting in accordance with Article 38 and a performance mandate in accordance wit...
Mobile phone base stations
Visualisation of the locations of mobile phone stations. More information Availability of mobile networks
2G (GSM) mobile telecom networks – antenna locations
Location and representation of mobile telecom antennas (GSM) with their different transmitting powers. More information 2G - GSM / EDGE availability